Local politician says report of cultural centre on hold is ‘unfounded’
The chair of the Greater Vernon Advisory Committee (GVAC) denies a report the proposed cultural centre has been put on hold due to higher than expected operational costs.
Akbal Mund calls that unfounded.
“If were basing everything on what the consultant’s report says — every report could be different — you could get three different consultants and all the reports are not going to be the same. So to defer the project because it said the operating costs will be higher than expected is unfounded. We don’t know what the operating costs are going to be,” Mund told Vernon Matters.
Mund said the costs could be higher or lower.











