City says shut down of Kal Tire Place South cost $22,000
City of Vernon staff have put a price tag on the repairs and ice installation costs for Kal Tire Place South during a lengthy shut down.
The 3,000-seat arena had to be closed, and the ice removed, after an ice chiller leak was detected March 9.
The chiller was repaired by March 13, and the ice surface was fully restored on the 20th.
A staff report to Vernon city council stated the repair and ice installation work cost around $17,700.