‘Significant’ damage to B.C. island community’s only bridge scraps reopening schedule
DELTA — A bridge that provides the only road access to a Metro Vancouver island community has suffered more significant damage than originally thought after the span was hit by a tugboat, and a precautionary boil-water advisory has also been issued.
Transit authority TransLink says the original plan to have the Westham Island Bridge repaired within several weeks “is no longer possible.”
TransLink says crews will carry out additional surveys and assessments on the wood-deck single-lane truss bridge, but no timeline on reopening to vehicle traffic has been announced.
The City of Delta says in a statement that after the vessel strike on Tuesday afternoon, a leak was discovered in the water main that runs in the Fraser River underneath the bridge.











